About Us
Our Clients
Services
Products
Trouble Shooting
C-T Principles
Photo Gallery
Request for Quote
Contact Us
Preface
Introduction
Definition
Principle of operation
Terminology
Better Air Flow
Pumping Head
Life Factor
Smaller Fan Motors
Casing
Classification
Thermal Design
Sump
Suction tank/auxiliary tank
Tower Structures
Fills
Sprinkler
Fan/ Fan Blades
Fan Drive Motor
Grills
Drift Eliminators
Installation
Towers
Sprinkler Assembly
Normal Conditions
Water quality Control
Post Erection Checks
Pre-commissioning checks
Maintenance Schedule
Preparation for Installation
•
Decrate all components, open all packages, and confirm nothing is damaged.
•
Check all components received as per packing slip (including fiberglass mat and resin).
•
Collect all tools and tackles as needed
-- spanners
-- drill and drill bit
-- pipe wrench
-- screw driver
-- Plier
-- hammer
-- files
-- spirit level / pipe level
-- slitting knife
-- brush
-- roller
•
Check concrete foundation, is as per drawing.
•
Check level of foundation legs and correct if required.
•
Install suction tank on central foundation, with correct orientation as decided by client.
•
Install pipe legs on circumferential pad foundation and slip in foundation bolts. Level top side with level pipe.
•
Install basin supporting ring and Bolt together, with supporting legs.
Bolt basin FRP section and place on top of Basin Ring.
•
Install Grill (Jali) support upper Ring support legs on top of Basin on edges.
•
Install upper ring and bolt to legs.
•
Install casing sections piece by piece and bolt together to next piece to form complete cylindrical shape.
•
Install motor supporting ring / bracket.
•
Install ladder.
•
Install motor and fan assembly (for large towers, for smaller tower these may be installed after fills).
•
Connect inlet stand pipe.
•
Bolt on sprinkler mounting pipe.
•
Install sprinkler head, by screwing on the pipe.
•
Screw in pipes and end caps and lock with locknut (for large towers turn buckles are to be used for maintaining PVC pipes horizontal).
•
Install clamp on central pipe.
•
Install cross member for fill support.
•
Place fill support grid and bolt in place to form ring.
•
Install fills by facing 150mm x 600 mm face down on grid, starting with diametrically placed packs, fill up rest of grid.
•
Install next fill pack layer at right angles to 1st layer.
•
Seal Basin flanges and suction tank with fiberglass mat and resin, and allow it to set before disturbing.
•
Install motor / fan protection grid with hinged portion in alignment with ladder.
•
Install grill (screen) for air inlet.
•
Brush coat bolt heads with resin for additional protection.
•
Provide bottom support for ladder.
About Us
|
Our Clients
|
Services
|
Products
|
Trouble Shooting
|
C-T Principles
|
Photo Gallery
|
Request For Quote
|
Contact Us
All Rights Reserved ©
Advance Cooling Towers Pvt. Ltd.
2006 - 2007.
Designed by:
Creative Web Mall