Advance Cooling Towers Pvt. Ltd., DM Series, TM Series, A Series About Us
  Advance Cooling Towers Pvt. Ltd., DM Series, TM Series, A Series Our Clients
  Advance Cooling Towers Pvt. Ltd., DM Series, TM Series, A Series Services
  Advance Cooling Towers Pvt. Ltd., DM Series, TM Series, A Series Products
  Advance Cooling Towers Pvt. Ltd., DM Series, TM Series, A Series Trouble Shooting
  Advance Cooling Towers Pvt. Ltd., DM Series, TM Series, A Series C-T Principles
  Advance Cooling Towers Pvt. Ltd., DM Series, TM Series, A Series Photo Gallery
  Advance Cooling Towers Pvt. Ltd., DM Series, TM Series, A Series Request for Quote
  Advance Cooling Towers Pvt. Ltd., DM Series, TM Series, A Series Contact Us
 
   
Preface
Introduction
Definition
Principle of operation
Terminology
Better Air Flow
Pumping Head
Life Factor
Smaller Fan Motors
Casing
Classification
Thermal Design
Sump
Suction tank/auxiliary tank
Tower Structures
Fills
Sprinkler
Fan/ Fan Blades
Fan Drive Motor
Grills
Drift Eliminators
Installation of Cooling
Towers
Sprinkler Assembly
Normal Conditions
Water quality Control
Post Erection Checks
Pre-commissioning checks
Maintenance Schedule
 

   
Go To Home Home Search Sitemap
   
   
Maintenance Shedule
 

Every Day
:
Check if -
1. Vibrations are normal / Noise normal.
2. Water distribution proper.
3. Fan Motor current normal in all three phases.
4. Inlet / outlet temperature of water normal.

Every Week:
1. Clean inlet jali to remove entrained matter.
2. Clean inlet water filter.
3. Clean sprinklers / nozzles if choked.
4. Check growth of Algae etc. and remove from sump.

Every Month:
1. Drain Tank , flush out and remove any sediment.
2. Check fills if clogged due to Algae, sediment / salts, etc.
3. Check structural / FRP casing and Basin damage and rep.
4. Clean from outside with soap and water.
5. Check and tighten all bolts.
6. Smear Bolts with grease to facilitate easy opening the next time.

Every Six Months:
1. Grease all bearings of motors.
2. Grease all bearings of sprinklers.
3. Check runout on fan motor shafer.
4. Clean blades of foreign matter.
5. Check fills if damaged and replace.

Replace bearings of sprinkler assembly after 2 years and fill with grease.
   


 
About Us | Our Clients | Services | Products | Trouble Shooting |
C-T Principles
| Photo Gallery | Request For Quote | Contact Us
 
 
   
All Rights Reserved © Advance Cooling Towers Pvt. Ltd. 2006 - 2007.
Designed by:
Creative Web Mall